

























| Particular | Job Descriptioin |
|---|---|
| A) SUBSURFACE INVESTIGATION          | Soil Investigation, Rock Drilling, Electrical Resistivity etc |
| B) R.C. PILING BY AUGER OR WASH BORING METHOD UPTO 500 mm DIA | Drawing, Layout & Construction |
| C) STRUCTURE RECTIFICATION WORK | Old structure remedial measure Investigation & Execution |
| D) GROUND MODIFICATION | Stone Columns,Soil inject Grouting, Lime Injections in soil, Timber piling convectional name sal Ballah pile under shallow foundation or Side wall protection, Sand drain, Chemical grouting etc. |